Follow the walking route
Trace where people naturally cross the slope, then mark the start and finish. A landing or turn can connect different levels without sending the path into a tree, gate or tight planting bed.
Review runoff above the steps
Show the crew where water travels during rain. The upper landing, side slopes and adjacent planting beds affect how much water and loose material reach the treads.
Carry a material through the space
A stone tread can repeat a patio border, wall cap or entry finish. Consider a distinct leading edge that remains visible from above. Mark exposed ends and where lawn or planting will meet the sides.
Plan what surrounds the flight
Look at lighting, rails, planting spread, mowing access and any wall that supports the grade. We discuss these with the steps before deciding which pieces can be installed in sequence.




