Start with the finished planting location
Draw the new tree, walkway or planting bed before booking the individual visits. If a stump sits under the proposed walkway, tell both the grinder and the installer where the finished edge and surface will be. Ask the installer what should be removed and who will prepare the area if remaining roots, chips or disturbed soil interfere with the plan.
Build utility locating into the calendar
New York 811 tells homeowners that a contractor doing excavation is responsible for contacting 811. Ask each contractor who will dig how they will handle their locate request, including a later crew planting the tree or installing posts. Give everyone the same work limits and access instructions. If the design moves to another part of the yard, tell the contractors while there is still time to check the new area.
Add privately installed systems to the drawing
The 811 homeowner guidance explains that privately owned lines can require separate locating. Point out sprinkler controls, a private well, septic features or a buried pet fence that may cross the route. Gather installation records if you have them and arrange private locating where needed. Leave the existing flags and paint in place while crews confirm what has been marked.
Set a handoff before the next crew arrives
Ask which work can share a visit and which phase needs an on-site check first. Write down who removes grinding chips, establishes the finished grade and accepts the prepared planting area. Keep material deliveries flexible until that handoff is confirmed. If a crew uncovers an unexpected obstruction or wet ground delays access, send the revised sequence to every contractor and supplier involved.
Homeowner checklist
- Drawing of final planting and paving limits
- Locate coordination for each excavator
- List of private underground systems
- Named person accepting each completed phase