Find the quantities behind each price
Ask each bidder to write down the paved area, excavation area and material selection used in the estimate. One patio price might assume the existing surface comes out easily. Another might include removing an old concrete base. Ask which conditions the estimator saw, which ones are assumptions and which work the price would cover if those assumptions prove accurate.
Read an allowance as a budget for a named item
If a proposal carries an allowance, ask what product or quantity the amount buys and whether delivery, labor and disposal are included. For example, request the paver model used for pricing or the volume of topsoil included. Ask for the price per additional unit and how actual quantities will be documented. Keep that information beside the corresponding line item in the other proposal.
Compare the same example on both estimates
Try a small hypothetical change. If each bid includes ten cubic yards of topsoil, ask each contractor what two extra yards would add, including any extra delivery or spreading charge. A second truck trip can change the answer. Repeat the exercise for the uncertainty most likely to affect your own project, such as hauling excavated material off the property.
Agree on who can approve changes
New York’s Attorney General recommends detailed written home improvement estimates and contracts that specify materials, payment schedules and timing. Ask the contractor to describe a proposed change in writing with its price and effect on the schedule. Name the person who can authorize it. That way a homeowner who is at work can review a photo or measurement before deciding whether to proceed.
Homeowner checklist
- Base quantities and material selections
- Included delivery, labor and disposal
- Unit prices or alternative pricing method
- Written authorization for changes